Univers school

Project description

Installation of electricity, lighting and power, telephone network, public address system, fire detection and extinction, air conditioning and heating, gas and solar installation.

  • Installed potency: 111 kw
  • Central Heat Production: 342 kw
  • Cold Production Plant: 56 kw
  • Solar Installation: 6,78 kw
Project details
  • Economic volume: 702.000€
  • Year of realization: 2015
  • Surface: 3.874 m2

Contact


Send us your message through the following form and we will respond as soon as possible.

See Privacy Policy and Legal Notice
Scroll to Top