Flumen Campus Nord UPC Building

Project description

Installation of electricity, lighting and power, weak signals, public address system, fire detection and protection, air conditioning and hydraulic installation.

  • Installed potency: 461 kW
  • Central Power Heat Production:  212,3 kW
  • Central Power Cold Production: 188,3 kw
Project details
  • Economic volume: 800.000€
  • Year of realization: 2015
  • Surface: 4.000 m2

Contact


Send us your message through the following form and we will respond as soon as possible.

See Privacy Policy and Legal Notice
Scroll to Top